Friday, August 15, 2008

Hydronic heat tubing installed

The siding for the outside (post wraps, soffits under the main deck) is complete. Just need to tap in stainless steel nails for the mitered joints.



The soffit material under the main deck. The same material was used to cover the stairway from the main landing to the deck.



Below is a photo record of all the main floor and upstairs hydronic tubing installed in the house. The basement photo record is in a much earlier post. All rooms in the house were photographed.











Funny. The sign says is pressure is below 50 psi, call the company immediately. I don't remember this being broken or cracked. And it reads ) psi. Obviously the system is still open, but I find it amusing.
























The pouring will happen early next week (probably Monday).



Tuesday, August 12, 2008

Stairs

Dad has started construction of the front and back stairs.



This overhang is bolted on by an L-bracket to the corner post.







Molly..helping out.

Saturday, August 2, 2008

Painting completed inside

These pictures are a record for interior design work. The paint is Manchester Tan (Parker Paint match).

Finishing up painting the inside of the house.



Spraying on the topcoat (no back rolling needed like the primer).



Patchwork in the dining room (aka finding the wire covered the first time)



Upstairs:

Laundry room upstairs



Upstairs bathroom



Master bed atrium



Master bed



Master bed (doorway)



Master bath (cabinet area)



Shower



Hallway into bath and side closet



Bedroom (with fireplace)



Main floor pictures:

Mini-bar area



Living/Dining rooms



Dining room (moving the trim wood - fir)



Living room fireplace



Stairwell upstairs



entry area from downstairs



Family room off kitchen



1st view of kitchen



2nd view of kitchen



Basement pictures (painting finished):

Basement Kitchenette


Laundry



Doors