The siding on the west side of the house is up.
Here is the house (lot) at the end of the block. It is a remodel - obviously the owners are remodeling, not building a new structure. I think one cement wall was left during the tear down.
Today Tony and Omar worked on the back of the house.
And Geoff has stripped the forms for the most recent pour.
Insulation should hopefully start soon, while work on the decking begins (along with railings).
1 comment:
building a house is a long process. will watch all that is posted here.
Post a Comment