Sunday, August 31, 2008

Window well installation

The window well chiseled-face blocks were installed on Saturday.

Gravel was delivered (5 yards of crushed gravel)





A branch sticking out in the alley (an easement) was snapped by the delivery truck. Nothing we could really do about it. The recent rains had made branches heavy, hanging low.



West side window well leveled and gravel added for base.



Joe and Dad working on the East side.





Work on the West side



Cutting blocks to fit the corners.



Finished East window well.







Finished West window well