Friday, August 15, 2008

Hydronic heat tubing installed

The siding for the outside (post wraps, soffits under the main deck) is complete. Just need to tap in stainless steel nails for the mitered joints.



The soffit material under the main deck. The same material was used to cover the stairway from the main landing to the deck.



Below is a photo record of all the main floor and upstairs hydronic tubing installed in the house. The basement photo record is in a much earlier post. All rooms in the house were photographed.











Funny. The sign says is pressure is below 50 psi, call the company immediately. I don't remember this being broken or cracked. And it reads ) psi. Obviously the system is still open, but I find it amusing.
























The pouring will happen early next week (probably Monday).



6 comments:

Anonymous said...

ive done something here to have you a few cents!

Anonymous said...

Gomen kudasai.

Anonymous said...

Thanks. Im Inspired again.

Anonymous said...

This is a nice blog. I like it!

Anonymous said...

All I can say is nothing because your blog is not interesting to read.

Anonymous said...

To the author of this blog,I appreciate your effort in this topic.