Tuesday, April 22, 2008

Soffit Material, Outside doors, and Stairwell footings

The footings for the main stairwell are framed, and ready to be poured soon.



Here are the back stairwell footings.





The neighborhood continues to change. This house, across the street and on the corner, is a "remodel." I think they are leaving one wall. It will be raised another story as well.



Basement doors (fir, storefront clear glass)



The main floor store front style door frame, with side window integrated into the framing



Here is the front door, oversized.





On its side is the family room sliding glass door, with integrated windows above.



All of these door above need to be sealed, or course.




The soffit material was delivered and brought up to the main floor where it will be stained. It is some pretty nice stock (smooth face).





Instead of using the Tyvek, GMCraft 60 felt paper (Grade D) was chosen. This is typical high level felt paper (that is, it must withstand water for at least 60 minutes before it lets anything through), and comparable to Tyvek (albiet no vapor breathing ability). Proper flashing and good installation will probably take care of any potential problems. Also, since cedar siding is going on, the potential for leaching exists (though if the cedar is properly primed, which it is, there shouldn't be a problem, and Tyvek has come out with a chemical resistant product in the last 5 years). I think we could have gone with the newer version of Tyvek, but this is what was picked. It will work just fine.

Friday, April 11, 2008

Speaker boxes and Footings

This week speaker boxes inside and outside the house were installed. In all, there are about 10 or so built in speaker boxes. Pretty cool!

These two are in the family room, for the surrond sound.



These two are in the master bedroom, again for the same thing.



There are one each in the upstairs bedrooms.



The remaining footings and retaining wall for the outside of the house are just about ready to be poured. A tent has been erected for this purpose.











Tuesday, April 1, 2008

Gutters

The gutters were installed yesterday. They are very nice, simple, and oversized gutters that come out 8 inches from the fascia.







Here is the Master jet tub installed.



Category wire installed for the two bedrooms.