Interior Window Trim, Doors, Cement Driveway, and Gas Hookup

Dad has been hard at work installing the interior window trim. It takes a lot of work, skill, and time.



The doors arrived today. They are solid core, flat (no panels) doors. Most of them will be painted the same color as the interior. Very nice doors.




The one interior store front door (natural light for the stairwell is desired)



Working on cleaning windows and filling nail holes and any small gaps with puddy. Not too hard a job for me.




The big door that will slide open for the master bed. It is suppose to be painted, but I really like the grain of the wood-possible we will just seal it?




Basement casing for the windows.




The driveway is being graded out and setup for an eventual pour (curb cut?). The bottom stairs will be poured at the same time.



Gas hookup. They went under the street instead of cutting into it, so hopefully it cost less than we were quoted.



Decking should arrive soon.

Wednesday, September 10, 2008

Wednesday, September 3, 2008

Prep and prime outside of house

Pictures of sealing off, prepping, and spot priming the exterior of the house.