Tuesday, December 4, 2007

Drainage/Sewer hookup complete

Drainage ready for inspection. Pour for slab is at 1 pm on Wednesday.



Notice the large grate (lid) on the catch basin. also, the crushed rock is small (to catch water), and not large (which lets water drain through)



This is the hookup to the sewer. All that was required was to hook up the green pipe to the swere connection, and clamp it down, but the city requires a whole bunch of money just to be allowed to do it (permit).

No comments: