Thursday, December 20, 2007

Main floor progress

The Main floor (middle one) is almost all the way up (these pictures where taken 11/19/07, yesterday). Everything is moving fast. One small problem occured. The stairs from the basement to the main floor had to be redesigned because they did not allow for enough clearance above. Possibly moving the garage to basement door to fix this.
I am posting the lots of pictures not for my ammusement, but for documentation and viewing for my Dad when he is out of the area (after all, he is the general contractor).






























The last three pictures are the stairwell (where the problem occured).



No comments: