Wednesday, December 10, 2008

Rail example and countertop slabs

The "railman" came over on Tuesday. This is the dimensions we all agreed upon. In his hand (on the left) is the rail cap. On the right is the vertical member, with 2 of the 6 horizontal pieces. He had a larger horizontal example, but it seemed a little clunky when looking from the street towards the house. Fabrication was suppose to start today at the job site. A black coating of some sort (which reflects light) will go on as well.



The two slabs finally went into the house. They were cut on site and installed.



Here is what the island (where the burners will go) looks like after being cleaned. A back splash with the same granite material (in tile) was installed at last night, as well as for the area facing the wall where the sink is located.




I put up some signs to impress the importance of not walking of the floors with shoes.

No comments: